Foundation Design
Foundation design is the technical process by which the appropriate characteristics and dimensions for foundation elements, such as short piles and footings, are determined, especially for light structures. This design is crucial to ensure the stability and safety of the construction.
Components of Foundation Design:
Land Evaluation:
Geotechnical Study: Detailed analysis of the soil to determine its physical and mechanical properties.
Load Tests: Carrying out tests to know the ultimate resistance of the ground.
Design of Short Piles:
Determination of Dimensions: Calculation of the necessary length and diameter for the piles, based on the load capacity of the soil.
Material Selection: Selection of the most suitable material for the piles according to the ground conditions and the requirements of the project.
Footing Design:
Size and Shape Calculation: Determination of the size and shape of the footings to adequately distribute the loads of the structure on the ground.
Structural Reinforcement: Incorporation of reinforcements to ensure the resistance and durability of the footings.
Optimization and Recommendations:
Construction Recommendations: Suggestions for the installation and construction of foundations, based on the characteristics of the soil and the structure.
Foundation Design Report:
Document that includes calculations, plans and recommendations for the construction of foundations, ensuring that they meet safety and efficiency standards.
The importance of foundation design lies in its ability to provide a solid and secure base for the structure, guaranteeing its stability and durability over time.
Transform your ideas into reality
Some of our projects
Malaga
141.77 MWp - Pull Out Test
Spain
Almeria
50MWp - Geotechnical Report
Spain
Lloseta
17 MWp - Informe Geotécnico + Pull Out Test España
Torino
15MWp - Pull Out Test
Italy
Buñol
3MWp - Informe Geotécnico + Pull Out Test
Spain
Belinchón
150MWp - Foundation design
Spain
Sarral
3.8 MWp - Informe de Cimentaciones + Pull Out Test España
Ceggia
18MWp - Pull Out Test
Italy
Zafra
5 MWp - Pull Out Test
Spain
Tarancon
150MWp - Pull Out Test
Spain
The Mudarra
150MWp - Informe geotécnico + Pull Out Test España
Vila Boa
22.43 MWp - Pull Out Test
Portugal